Skip to content
Adalwin Global

Try: terry, FOB, Solapur, Heimtextil, Oeko-Tex, MOQ, Singapore

navigate· open·esc close

Start an RFQ

Home/Services/Sourcing

Sourcing.

Sourcing isn't a search engine — it's relationships. We route every SKU class to the corridor built for it.

Most of India's manufacturing edge comes from specialist clusters that don't show up in directories. We have the relationships and the routing logic to assemble the right capacity for your programme — without you onboarding twenty suppliers.

What's included

The shape of the engagement.

01

Supplier identification

Vetted production units across Solapur (terry, robes), Panipat (bed linen), Karur (table) and Erode (knits, spa pile). Capability, capacity, compliance, and historical export record verified before introduction.

02

Multi-corridor pricing

Indicative FOB across two or three corridors per RFQ so buyers can compare. Container-load math (CBM, 20'/40' HC) baked into every quote.

03

Sample coordination

Physical samples pulled at the assigned unit. DHL to your address. 14 – 21 days from brief to your desk; revisions at unit cost until sign-off.

04

Capacity scheduling

Production slot blocked against your PO. Cross-corridor diversification on multi-SKU programmes to compress lead times.

How it runs

Four phases, one PO.

  1. 01

    Brief

    Tech pack, MOQ target, destination port, cadence.

  2. 02

    Route

    Corridor assignment + indicative FOB inside one business day.

  3. 03

    Sample

    Physical sample pulled and shipped DHL.

  4. 04

    Sign-off

    Approve construction → PO cut against LC or TT.

Outcomes

What buyers actually get.

  • Single counterparty, multi-unit execution
  • Diversified supplier risk without the overhead
  • Buyer-spec accuracy verified at sample stage

Ready to start

Send a brief. We'll respond inside one business day.

Open an RFQ